In this project, we worked on strengthening and leveling the floor structure. We carefully raised the floor joist using a steel beam and adjustable supports to make space for a new base. We then installed a protective layer and a solid treated wood base, securely anchored to the foundation. After that, new wall studs were added at regular intervals to ensure everything was properly supported and built to last.