This project focused on rebuilding and improving the drainage of an existing window well. The team started by removing and disposing of the old materials, then cleared out excess soil and debris to create six inches of proper clearance beneath the window. A clean layer of stone was added to promote better water drainage and stability.
A new window well was constructed using treated lumber for long-lasting protection. To further prevent moisture buildup, a drainage mat was installed along the exterior and finished neatly with a mould strip at the top edge. The area was then backfilled with soil and completed with a custom-made aluminum grill, providing a durable, clean, and secure finish.